Serving Chennai, Kanchipuram, Chengalpattu and Tiruvallur+91 90030 05888info@captureindia.com
CaptureIndia.comA Drone Filming Company

Builder handover record in Adyar

A dated aerial record of the buildings and common areas on the day they pass from the builder to the owners, fair to both sides and useful for years afterwards.

The day a builder in Adyar hands a project to its owners’ association, responsibility changes hands. A dated record of that day protects both sides. In Adyar the first question about any property is where the water goes.

Adyar sits where the Adyar river meets the sea, with old garden houses, apartment blocks and some of south Chennai’s most valuable plots.

Why both sides should want one

For the association, the record shows the condition of everything it is taking over. Defects visible on that day can be listed and raised with the builder during the defect liability period. Without a record, the association is left with members’ recollections.

For the builder, the same record is protection. It shows that the buildings were handed over complete and in good order. Damage caused later, by residents’ alterations, by interior contractors or by poor maintenance, cannot fairly be laid at the builder’s door.

A record made by a third party with no interest in the outcome carries more weight than photographs taken by either side. That is the role Capture India plays: we film what is there and deliver it.

The property you find in Adyar

Adyar is one of south Chennai’s oldest planned residential areas, laid out in neighbourhoods such as Gandhi Nagar, Kasturba Nagar and Indira Nagar. Large family houses on generous plots still stand here, though many have made way for apartment blocks. A good number of owners live abroad, and their houses are let, locked or waiting to be redeveloped.

In Adyar, the property an owner or buyer wants checked is usually one of these.

  • Older independent houses. Family homes built decades ago, now let, locked or shared between heirs.
  • Mid-rise apartment blocks. A handful of flats sharing one roof, one compound and the cost of every repair.
  • Vacant plots. Scarce and valuable, which is exactly why they need watching.

For each of them the questions are the same. What condition is the building in from outside? What has been built next door since you last saw it? Is the boundary where it should be?

What the record should include

A handover record is planned to be complete, not selective.

  • All outer faces of every block, from ground to roof, including the faces that look on to neighbouring plots.
  • Terraces: the surface, slopes, outlets, parapets, tanks, lift rooms and any solar or other equipment.
  • External pipes, shafts and sunshades.
  • The compound wall, gates and security cabin.
  • Driveways, paving, open parking, landscaping and play areas.
  • Sump, transformer yard, generator area and sewage treatment plant, as seen from above.
  • The road and drains outside, and the state of neighbouring plots.

Amenities and areas indoors are not covered, because inspection missions are flown outdoors. Those should be recorded separately on the ground by the association and the builder together.

What to look at in Adyar

The Adyar river runs along the northern edge and the Buckingham Canal cuts through the area, and streets near both took in water in the floods of December 2015. From the air you can see how a property sits in relation to the river, the canal and the estuary, and what has been built on the plots around it.

From the air you can see:

  • how close the property is to the lake, river or canal;
  • whether the street and the plots around it lie lower than the main road;
  • where the storm-water drains run, and where they stop;
  • whether water is standing on open land nearby on the day of the flight;
  • whether neighbouring plots have been raised with fill, leaving yours lower.

If you are buying, order the mission during or just after the north-east monsoon, between October and December, when the ground has the most to show.

A handover record in Adyar: price and delivery

High-rise building inspection has its own fee, and a handover record is charged under it.

  • The fee starts from Rs. 6,000, which covers a quick video of up to 15 minutes.
  • We generally charge Rs. 30,000 per block or building for a full inspection.
  • Conveyance is Rs. 3,000.
  • GST and other actuals are additional.

Prices may vary with complexity, approval timelines and any additional services requested. T&C apply. The number of blocks, the height, how closely the neighbouring buildings stand and the airspace at the address all affect the work, so send those details and we confirm the price before you order.

For each block or building you receive a video of about 15 minutes. On a large or complicated building the footage can run up to 45 minutes, in which case it is delivered unedited so that nothing is left out.

An association or owner can pay through the Book a drone page once the amount is confirmed. The pricing page shows the standard mission fee alongside, for smaller buildings and single houses.

Orders for Adyar start with the location. From it we work out the conveyance and plan the mission.

Large parts of Chennai lie within the controlled airspace around the airport or close to other protected sites, and every address in Adyar has to be checked. The limits differ from one street to the next.

We deliver within 7 working days, subject to Airspace Flying Approval. A location close to the airport or another protected site can take longer. With the order we need the first three pages of the land deed, the Google Maps location and your identity proof. T&C apply.

How to order

  1. Place your order. Send the Google Maps location, the first three pages of the land deed and your Aadhaar card or passport, and pay the mission fee.
  2. We plan the flight. We validate your documents and plan the flight. Subject to Airspace Flying Approval.
  3. We fly the mission. A pilot from our team or from one of our associates flies the property and its surroundings.
  4. You receive the output. 20 to 30 photographs and a video of about 5 minutes, within 7 working days, subject to Airspace Flying Approval.

What you send with the order

  • The first three pages of the land deed for the property
  • The Google Maps location of the property
  • Your Aadhaar card or passport, front and back, with your address visible. If the address is not shown, add any other proof of address
  • Payment of the mission fee

Questions

When should we order?

Ahead of the planned handover. We deliver within 7 working days, subject to Airspace Flying Approval.

Who should order the handover record?

Either the association or the builder, or both jointly. The footage is delivered to whoever places the order.

Can a drone fly in Adyar?

It depends on the address. Much of Chennai, including Adyar, has to be checked against the controlled airspace around the airport and other protected sites. Each mission is subject to Airspace Flying Approval.

How soon will I receive the footage for a property in Adyar?

We deliver within 7 working days, subject to Airspace Flying Approval. A location close to the airport or another protected site can take longer.

What is a mission? What if the weather turns? See all common questions.

Tell us where in Adyar the property is.

Remote property monitoring: Rs. 6,000 + GST + a small conveyance fee for the movements. Send the location and we will confirm what your order needs.