The day a builder hands a project to its owners’ association is the day responsibility changes hands. After it, arguments begin: was that crack there at handover, was the terrace ever waterproofed properly, was the boundary wall complete? A dated video of the whole project settles such questions before they are asked.
Why both sides should want one
For the association, the record shows the condition of everything it is taking over. Defects visible on that day can be listed and raised with the builder during the defect liability period. Without a record, the association is left with members’ recollections.
For the builder, the same record is protection. It shows that the buildings were handed over complete and in good order. Damage caused later, by residents’ alterations, by interior contractors or by poor maintenance, cannot fairly be laid at the builder’s door.
A record made by a third party with no interest in the outcome carries more weight than photographs taken by either side. That is the role Capture India plays: we film what is there and deliver it.
What the record should include
A handover record is planned to be complete, not selective.
- All outer faces of every block, from ground to roof, including the faces that look on to neighbouring plots.
- Terraces: the surface, slopes, outlets, parapets, tanks, lift rooms and any solar or other equipment.
- External pipes, shafts and sunshades.
- The compound wall, gates and security cabin.
- Driveways, paving, open parking, landscaping and play areas.
- Sump, transformer yard, generator area and sewage treatment plant, as seen from above.
- The road and drains outside, and the state of neighbouring plots.
Amenities and areas indoors are not covered, because inspection missions are flown outdoors. Those should be recorded separately on the ground by the association and the builder together.
Timing the mission
The best moment is shortly before the formal handover, when the builder says the work is complete and before the association signs anything. That leaves time to raise what the footage shows.
We deliver within 7 working days, subject to Airspace Flying Approval. So the order should be placed ahead of the planned handover date.
Many associations repeat the exercise towards the end of the defect liability period. Comparing the two records shows what has deteriorated in the meantime and what should be raised with the builder before the period runs out. What the builder is obliged to repair is a legal question for the association’s advocate; the footage supplies the facts.
The price of a handover record
Tall buildings take longer to film than a plot or a house, and they are priced separately. A handover record comes under our high-rise fee.
- From Rs. 6,000 for a quick video of up to 15 minutes.
- Generally Rs. 30,000 per block or building for the full inspection.
- Conveyance of Rs. 3,000.
- GST and other actuals additional.
Prices may vary with complexity, approval timelines and any additional services requested. T&C apply. Tell us how many blocks there are, how many floors, and where the building is. We confirm the amount before you commit.
You receive a video of about 15 minutes for each block or building. Where the building is large or its faces are complicated, the footage may run up to 45 minutes and is then delivered unedited.
If the weather stops a flight, we fly again for the same area, generally at no extra charge; in rare cases we charge the conveyance and transport for the repeat visit. Payment is taken on the Book a drone page.
Set against the work it informs, the fee is small. Scaffolding or a cradle for a tall building is a far larger expense, and repainting or waterproofing a complex runs to many lakhs. The inspection makes sure that money goes where it is needed, and gives every contractor the same defined work to quote for.
Orders cannot be cancelled once placed, and a payment made twice by mistake is refunded. If the Airspace Flying Approval is not granted, we deduct an admin charge of Rs. 1,500 plus GST and return the balance.
Delivery and timing for a handover record
We deliver within 7 working days, subject to Airspace Flying Approval. For a handover record, that is the whole timetable.
In those days we plan the mission, apply for approval where the airspace needs it, allocate the pilot and the drone, fly, and edit the footage. Parts of the Chennai region lie close to the airport and other protected sites, so a few addresses take longer than the rest. If yours is one of them, we tell you when you send the location.
The flight itself is planned for a day with safe weather. We do not fly in rain or strong wind. If the weather stops a flight, we fly again for the same area, generally at no extra charge; in rare cases we charge the conveyance and transport for the repeat visit.
If the Airspace Flying Approval is not granted, the mission cannot be flown. We deduct an admin charge of Rs. 1,500 plus GST and refund the balance. If you paid from outside India, the balance is credited to your Capture India wallet for another mission. T&C apply.
Weather is the other variable. We do not fly in rain or strong wind. If a mission cannot be flown because of the weather, we fly again for the same area, and generally there is no extra charge. In rare cases we charge the conveyance and transport for the repeat visit.
This service, place by place
- Adambakkam
- Adyar
- Alandur
- Alwarpet
- Ambattur
- Anakaputhur
- Anna Nagar
- Ashok Nagar
- Chromepet
- Egattur
- Egmore
- Guindy
- Karapakkam
- Kattankulathur
- Kazhipattur
- Kelambakkam
- Kilpauk
- Kodambakkam
- Kottivakkam
- Koyambedu
- Madipakkam
- Maduravoyal
- Manapakkam
- Maraimalai Nagar
- Medavakkam
- Mogappair
- Mugalivakkam
- Mylapore
- Navalur
- Nungambakkam
- Padur
- Palavakkam
- Pallavaram
- Pallikaranai
- Pammal
- Paranur
- Perambur
- Perumbakkam
- Perungalathur
- Perungudi
- Porur
- Potheri
- Rajakilpakkam
- Ramapuram
- Saidapet
- Sembakkam
- Semmancheri
- Sholinganallur
- Siruseri
- Sithalapakkam
- T. Nagar
- Tambaram
- Taramani
- Thazhambur
- Thiruvanmiyur
- Thoraipakkam
- Tiruvottiyur
- Vadapalani
- Vandalur
- Velachery
- Villivakkam
- Virugambakkam
How to order
- Place your order. Send the Google Maps location, the first three pages of the land deed and your Aadhaar card or passport, and pay the mission fee.
- We plan the flight. We validate your documents and plan the flight. Subject to Airspace Flying Approval.
- We fly the mission. A pilot from our team or from one of our associates flies the property and its surroundings.
- You receive the output. 20 to 30 photographs and a video of about 5 minutes, within 7 working days, subject to Airspace Flying Approval.
What you send with the order
- The first three pages of the land deed for the property
- The Google Maps location of the property
- Your Aadhaar card or passport, front and back, with your address visible. If the address is not shown, add any other proof of address
- Payment of the mission fee
Questions
Who should order the handover record?
Either the association or the builder, or both jointly. The footage is delivered to whoever places the order.
Does the record prove a defect is the builder's responsibility?
It shows the condition on the date of the mission. Responsibility is decided under the agreement and the law, on your advocate's advice.
When should we order?
Ahead of the planned handover. We deliver within 7 working days, subject to Airspace Flying Approval.
Does anyone need to be at the property?
No. Nobody needs to be present for a mission over a plot or the outside of a building. For an apartment building, the association should know the date.
What if the Airspace Flying Approval is not granted?
The mission cannot be flown. We deduct an admin charge of Rs. 1,500 plus GST and refund the balance. If you paid from outside India, the balance is credited to your wallet for another mission.
What is a mission? What if the weather turns? See all common questions.