The day a builder in Kazhipattur hands a project to its owners’ association, responsibility changes hands. A dated record of that day protects both sides. In Kazhipattur tall buildings stand on low ground, and both facts matter.
Kazhipattur is on OMR between Egattur and Padur, with apartment projects on the main road and layouts behind.
Timing the mission
The best moment is shortly before the formal handover, when the builder says the work is complete and before the association signs anything. That leaves time to raise what the footage shows.
We deliver within 7 working days, subject to Airspace Flying Approval. So the order should be placed ahead of the planned handover date.
Many associations repeat the exercise towards the end of the defect liability period. Comparing the two records shows what has deteriorated in the meantime and what should be raised with the builder before the period runs out. What the builder is obliged to repair is a legal question for the association’s advocate; the footage supplies the facts.
The property you find in Kazhipattur
Kazhipattur is one of the villages that the IT corridor has absorbed. Apartment complexes face the main road, and plotted layouts and smaller blocks lie on the side roads. The backwaters are close on the eastern side.
Most of the requests we expect from Kazhipattur concern these kinds of property.
- Mid-rise apartment blocks. A handful of flats sharing one roof, one compound and the cost of every repair.
- Flats in high-rise towers. Often bought as an investment, then let out or kept locked while the owner works elsewhere.
- Layout plots. Often owned by people who live in Chennai or abroad and have not seen the land in years.
For each of them the questions are the same. What condition is the building in from outside? What has been built next door since you last saw it? Is the boundary where it should be?
Why both sides should want one
For the association, the record shows the condition of everything it is taking over. Defects visible on that day can be listed and raised with the builder during the defect liability period. Without a record, the association is left with members’ recollections.
For the builder, the same record is protection. It shows that the buildings were handed over complete and in good order. Damage caused later, by residents’ alterations, by interior contractors or by poor maintenance, cannot fairly be laid at the builder’s door.
A record made by a third party with no interest in the outcome carries more weight than photographs taken by either side. That is the role Capture India plays: we film what is there and deliver it.
Who orders a mission in Kazhipattur
A mission in Kazhipattur is useful to several kinds of owner and buyer.
- NRI owners who want to see their property once or twice a year without asking a relative to visit.
- Apartment associations planning painting, waterproofing or repairs.
- Buyers of resale flats and houses who want an independent look at the building and the street before paying an advance.
- Buyers of plots who want to see the land, the approach and the surroundings before they commit.
The mission is planned around the customer. A buyer’s footage dwells on access and surroundings, an owner’s on boundaries and roofs. One line in the order is enough to set that.
You receive 20 to 30 photographs and a video of about 5 minutes. They cover the property, the neighbourhood and the adjacent roads and pathways, subject to privacy and airspace limits, and are enhanced with editing software for clarity. Raw files are available if you ask before the mission starts. Download everything when it arrives: we keep files for 15 days after delivery.
Price and delivery for a handover record in Kazhipattur
Tall buildings take longer to film than a plot or a house, and they are priced separately. A handover record comes under our high-rise fee.
- From Rs. 6,000 for a quick video of up to 15 minutes.
- Generally Rs. 30,000 per block or building for the full inspection.
- Conveyance of Rs. 3,000.
- GST and other actuals additional.
Prices may vary with complexity, approval timelines and any additional services requested. T&C apply. Tell us how many blocks there are, how many floors, and where the building is. We confirm the amount before you commit.
You receive a video of about 15 minutes for each block or building. Where the building is large or its faces are complicated, the footage may run up to 45 minutes and is then delivered unedited.
If the weather stops a flight, we fly again for the same area, generally at no extra charge; in rare cases we charge the conveyance and transport for the repeat visit. Payment is taken on the Book a drone page.
Send us the location in Kazhipattur first. We tell you the conveyance and plan the mission once you order.
Kazhipattur is south of the city. Parts of this corridor fall under the controlled airspace of Chennai airport and the Tambaram air force station, so every address has to be checked. The airspace limit is read for each location.
We deliver within 7 working days, subject to Airspace Flying Approval. A location close to the airport or another protected site can take longer. With the order we need the first three pages of the land deed, the Google Maps location and your identity proof. T&C apply.
How to order
- Place your order. Send the Google Maps location, the first three pages of the land deed and your Aadhaar card or passport, and pay the mission fee.
- We plan the flight. We validate your documents and plan the flight. Subject to Airspace Flying Approval.
- We fly the mission. A pilot from our team or from one of our associates flies the property and its surroundings.
- You receive the output. 20 to 30 photographs and a video of about 5 minutes, within 7 working days, subject to Airspace Flying Approval.
What you send with the order
- The first three pages of the land deed for the property
- The Google Maps location of the property
- Your Aadhaar card or passport, front and back, with your address visible. If the address is not shown, add any other proof of address
- Payment of the mission fee
Questions
Does the record prove a defect is the builder's responsibility?
It shows the condition on the date of the mission. Responsibility is decided under the agreement and the law, on your advocate's advice.
When should we order?
Ahead of the planned handover. We deliver within 7 working days, subject to Airspace Flying Approval.
Can a drone fly in Kazhipattur?
It depends on the address. Parts of the corridor south of Chennai fall under controlled airspace, so the airspace zone matters here. Each mission is subject to Airspace Flying Approval.
How soon will I receive the footage for a property in Kazhipattur?
We deliver within 7 working days, subject to Airspace Flying Approval. A location close to the airport or another protected site can take longer.
What is a mission? What if the weather turns? See all common questions.