The day a builder in Maduravoyal hands a project to its owners’ association, responsibility changes hands. A dated record of that day protects both sides. Around Maduravoyal, lakes and low ground shape every decision about property.
The day a builder hands a project to its owners’ association is the day responsibility changes hands. After it, arguments begin: was that crack there at handover, was the terrace ever waterproofed properly, was the boundary wall complete? A dated video of the whole project settles such questions before they are asked.
Maduravoyal is a western suburb where the Poonamallee High Road meets the bypass, with the Cooum river along one side.
What the record should include
A handover record is planned to be complete, not selective.
- All outer faces of every block, from ground to roof, including the faces that look on to neighbouring plots.
- Terraces: the surface, slopes, outlets, parapets, tanks, lift rooms and any solar or other equipment.
- External pipes, shafts and sunshades.
- The compound wall, gates and security cabin.
- Driveways, paving, open parking, landscaping and play areas.
- Sump, transformer yard, generator area and sewage treatment plant, as seen from above.
- The road and drains outside, and the state of neighbouring plots.
Amenities and areas indoors are not covered, because inspection missions are flown outdoors. Those should be recorded separately on the ground by the association and the builder together.
The property you find in Maduravoyal
Maduravoyal sits at one of the main road junctions on the western side of Chennai. A university campus, hospitals and apartment projects have grown up around it, with residential layouts behind. The Cooum river passes close to the area.
Most of the requests we expect from Maduravoyal concern these kinds of property.
- Flats in smaller blocks. Three or four floors, a shared terrace, and an association that may or may not be active.
- Houses on individual plots. The roof, the wall and the open space around the house are all the owner’s concern.
- Commercial property. Let to businesses that add signs, sheds and floors as they need them.
For each of them the questions are the same. What condition is the building in from outside? What has been built next door since you last saw it? Is the boundary where it should be?
Timing the mission
The best moment is shortly before the formal handover, when the builder says the work is complete and before the association signs anything. That leaves time to raise what the footage shows.
We deliver within 7 working days, subject to Airspace Flying Approval. So the order should be placed ahead of the planned handover date.
Many associations repeat the exercise towards the end of the defect liability period. Comparing the two records shows what has deteriorated in the meantime and what should be raised with the builder before the period runs out. What the builder is obliged to repair is a legal question for the association’s advocate; the footage supplies the facts.
Finding your property in Maduravoyal
A survey number tells the revenue office where land is. It does not tell a pilot. In Maduravoyal, properties are found by what they are near: the Chennai bypass, Poonamallee High Road, the Cooum river or the way to Koyambedu.
So an order for Maduravoyal should carry three things about location. First, a Google Maps pin dropped on the property. Second, the name of the layout, street or project, with the plot or door number. Third, the nearest well-known place and which side of it the property lies. With those, the mission can be planned without a phone call.
When the footage arrives, start with the wide shots. They show the property against the things you already know, such as the Chennai bypass, and make it easy to explain to a relative, an advocate or a buyer exactly where it is.
These names are mentioned only as reference points. Capture India is not connected with them.
What a handover record costs in Maduravoyal
Tall buildings take longer to film than a plot or a house, and they are priced separately. A handover record comes under our high-rise fee.
- From Rs. 6,000 for a quick video of up to 15 minutes.
- Generally Rs. 30,000 per block or building for the full inspection.
- Conveyance of Rs. 3,000.
- GST and other actuals additional.
Prices may vary with complexity, approval timelines and any additional services requested. T&C apply. Tell us how many blocks there are, how many floors, and where the building is. We confirm the amount before you commit.
You receive a video of about 15 minutes for each block or building. Where the building is large or its faces are complicated, the footage may run up to 45 minutes and is then delivered unedited.
If the weather stops a flight, we fly again for the same area, generally at no extra charge; in rare cases we charge the conveyance and transport for the repeat visit. Payment is taken on the Book a drone page.
Orders for Maduravoyal start with the location. From it we work out the conveyance and plan the mission.
Maduravoyal is in the western suburbs, within reach of the controlled airspace around Chennai airport, so every address has to be checked. The airspace limit is read for each location.
We deliver within 7 working days, subject to Airspace Flying Approval. A location close to the airport or another protected site can take longer. With the order we need the first three pages of the land deed, the Google Maps location and your identity proof. T&C apply.
How to order
- Place your order. Send the Google Maps location, the first three pages of the land deed and your Aadhaar card or passport, and pay the mission fee.
- We plan the flight. We validate your documents and plan the flight. Subject to Airspace Flying Approval.
- We fly the mission. A pilot from our team or from one of our associates flies the property and its surroundings.
- You receive the output. 20 to 30 photographs and a video of about 5 minutes, within 7 working days, subject to Airspace Flying Approval.
What you send with the order
- The first three pages of the land deed for the property
- The Google Maps location of the property
- Your Aadhaar card or passport, front and back, with your address visible. If the address is not shown, add any other proof of address
- Payment of the mission fee
Questions
Who should order the handover record?
Either the association or the builder, or both jointly. The footage is delivered to whoever places the order.
Does the record prove a defect is the builder's responsibility?
It shows the condition on the date of the mission. Responsibility is decided under the agreement and the law, on your advocate's advice.
Can a drone fly in Maduravoyal?
It depends on the address. Maduravoyal is within reach of the controlled airspace around Chennai airport, so the airspace zone matters here. Each mission is subject to Airspace Flying Approval.
How soon will I receive the footage for a property in Maduravoyal?
We deliver within 7 working days, subject to Airspace Flying Approval. A location close to the airport or another protected site can take longer.
What is a mission? What if the weather turns? See all common questions.