Serving Chennai, Kanchipuram, Chengalpattu and Tiruvallur+91 90030 05888info@captureindia.com
CaptureIndia.comA Drone Filming Company

Builder handover record in Perungalathur

A dated aerial record of the buildings and common areas on the day they pass from the builder to the owners, fair to both sides and useful for years afterwards.

The day a builder in Perungalathur hands a project to its owners’ association, responsibility changes hands. A dated record of that day protects both sides. In Perungalathur the first question about any property is where the water goes.

The day a builder hands a project to its owners’ association is the day responsibility changes hands. After it, arguments begin: was that crack there at handover, was the terrace ever waterproofed properly, was the boundary wall complete? A dated video of the whole project settles such questions before they are asked.

Perungalathur is a residential suburb on GST Road between Tambaram and Vandalur, with a railway station, a lake and layouts on both sides of the highway.

What the record should include

A handover record is planned to be complete, not selective.

  • All outer faces of every block, from ground to roof, including the faces that look on to neighbouring plots.
  • Terraces: the surface, slopes, outlets, parapets, tanks, lift rooms and any solar or other equipment.
  • External pipes, shafts and sunshades.
  • The compound wall, gates and security cabin.
  • Driveways, paving, open parking, landscaping and play areas.
  • Sump, transformer yard, generator area and sewage treatment plant, as seen from above.
  • The road and drains outside, and the state of neighbouring plots.

Amenities and areas indoors are not covered, because inspection missions are flown outdoors. Those should be recorded separately on the ground by the association and the builder together.

The property you find in Perungalathur

Perungalathur is the first stop south of Tambaram on the suburban line. Layouts sold from the 1980s onwards have filled with independent houses, and apartment blocks now stand along the highway and near the station. The lake on the western side is the landmark of the area.

Most of the requests we expect from Perungalathur concern these kinds of property.

  • Independent houses on their own plots. Everything inside the compound wall is the owner’s to look after.
  • Flats in smaller blocks. Three or four floors, a shared terrace, and an association that may or may not be active.
  • Plots in layouts. Bought years ago as an investment and seldom visited since.

The owner’s questions do not change much from one to the next: how does it look from outside, what is new on the adjoining plots, and is anything on the land that should not be there.

Timing the mission

The best moment is shortly before the formal handover, when the builder says the work is complete and before the association signs anything. That leaves time to raise what the footage shows.

We deliver within 7 working days, subject to Airspace Flying Approval. So the order should be placed ahead of the planned handover date.

Many associations repeat the exercise towards the end of the defect liability period. Comparing the two records shows what has deteriorated in the meantime and what should be raised with the builder before the period runs out. What the builder is obliged to repair is a legal question for the association’s advocate; the footage supplies the facts.

What to look at in Perungalathur

Streets near the lake and towards Mudichur lie low and were flooded in December 2015. Check the level of the street, the path of the channels, and whether the plots around yours have been raised.

The footage lets you check:

  • how close the property is to the lake, river or canal;
  • whether the street and the plots around it lie lower than the main road;
  • where the storm-water drains run, and where they stop;
  • whether water is standing on open land nearby on the day of the flight;
  • whether neighbouring plots have been raised with fill, leaving yours lower.

The weeks during and just after the north-east monsoon, from October to December, are the best time to see how the land handles water.

A handover record in Perungalathur: price and delivery

High-rise building inspection has its own fee, and a handover record is charged under it.

  • The fee starts from Rs. 6,000, which covers a quick video of up to 15 minutes.
  • We generally charge Rs. 30,000 per block or building for a full inspection.
  • Conveyance is Rs. 3,000.
  • GST and other actuals are additional.

Prices may vary with complexity, approval timelines and any additional services requested. T&C apply. The number of blocks, the height, how closely the neighbouring buildings stand and the airspace at the address all affect the work, so send those details and we confirm the price before you order.

For each block or building you receive a video of about 15 minutes. On a large or complicated building the footage can run up to 45 minutes, in which case it is delivered unedited so that nothing is left out.

An association or owner can pay through the Book a drone page once the amount is confirmed. The pricing page shows the standard mission fee alongside, for smaller buildings and single houses.

Send us the location in Perungalathur first. We tell you the conveyance and plan the mission once you order.

Perungalathur is close to Chennai airport and to the Tambaram air force station, inside controlled airspace, so flights here are subject to Airspace Flying Approval.

We deliver within 7 working days, subject to Airspace Flying Approval. A location close to the airport or another protected site can take longer. With the order we need the first three pages of the land deed, the Google Maps location and your identity proof. T&C apply.

How to order

  1. Place your order. Send the Google Maps location, the first three pages of the land deed and your Aadhaar card or passport, and pay the mission fee.
  2. We plan the flight. We validate your documents and plan the flight. Subject to Airspace Flying Approval.
  3. We fly the mission. A pilot from our team or from one of our associates flies the property and its surroundings.
  4. You receive the output. 20 to 30 photographs and a video of about 5 minutes, within 7 working days, subject to Airspace Flying Approval.

What you send with the order

  • The first three pages of the land deed for the property
  • The Google Maps location of the property
  • Your Aadhaar card or passport, front and back, with your address visible. If the address is not shown, add any other proof of address
  • Payment of the mission fee

Questions

Who should order the handover record?

Either the association or the builder, or both jointly. The footage is delivered to whoever places the order.

Does the record prove a defect is the builder's responsibility?

It shows the condition on the date of the mission. Responsibility is decided under the agreement and the law, on your advocate's advice.

Can a drone fly in Perungalathur?

It depends on the address. Perungalathur is close to Chennai airport and the Tambaram air force station, inside controlled airspace. Each mission is subject to Airspace Flying Approval.

How soon will I receive the footage for a property in Perungalathur?

We deliver within 7 working days, subject to Airspace Flying Approval. A location close to the airport or another protected site can take longer.

What is a mission? What if the weather turns? See all common questions.

Tell us where in Perungalathur the property is.

Remote property monitoring: Rs. 6,000 + GST + a small conveyance fee for the movements. Send the location and we will confirm what your order needs.