The day a builder in Kelambakkam hands a project to its owners’ association, responsibility changes hands. A dated record of that day protects both sides. In Kelambakkam tall buildings stand on low ground, and both facts matter.
The day a builder hands a project to its owners’ association is the day responsibility changes hands. After it, arguments begin: was that crack there at handover, was the terrace ever waterproofed properly, was the boundary wall complete? A dated video of the whole project settles such questions before they are asked.
Kelambakkam is the junction on the IT corridor where the road from Vandalur meets OMR, with apartments, villas, colleges and layouts around it.
What the record should include
A handover record is planned to be complete, not selective.
- All outer faces of every block, from ground to roof, including the faces that look on to neighbouring plots.
- Terraces: the surface, slopes, outlets, parapets, tanks, lift rooms and any solar or other equipment.
- External pipes, shafts and sunshades.
- The compound wall, gates and security cabin.
- Driveways, paving, open parking, landscaping and play areas.
- Sump, transformer yard, generator area and sewage treatment plant, as seen from above.
- The road and drains outside, and the state of neighbouring plots.
Amenities and areas indoors are not covered, because inspection missions are flown outdoors. Those should be recorded separately on the ground by the association and the builder together.
The property you find in Kelambakkam
Kelambakkam stands at the meeting of Old Mahabalipuram Road and the road to Vandalur. Colleges, a hospital campus and the IT parks to the north have drawn apartment projects, villa communities and plotted layouts. A good deal of this property is owned by investors who do not live here.
The property people ask us about in Kelambakkam falls into a few kinds.
- Flats in smaller blocks. Three or four floors, a shared terrace, and an association that may or may not be active.
- Villas and gated communities. Second homes that stand locked for most of the year.
- Plots in layouts. Bought years ago as an investment and seldom visited since.
The owner’s questions do not change much from one to the next: how does it look from outside, what is new on the adjoining plots, and is anything on the land that should not be there.
Timing the mission
The best moment is shortly before the formal handover, when the builder says the work is complete and before the association signs anything. That leaves time to raise what the footage shows.
We deliver within 7 working days, subject to Airspace Flying Approval. So the order should be placed ahead of the planned handover date.
Many associations repeat the exercise towards the end of the defect liability period. Comparing the two records shows what has deteriorated in the meantime and what should be raised with the builder before the period runs out. What the builder is obliged to repair is a legal question for the association’s advocate; the footage supplies the facts.
High-rise and apartment buildings in Kelambakkam
Kelambakkam has a growing number of taller apartment and commercial buildings among its houses and smaller blocks. Even a block of four or five floors has outer walls that nobody can inspect from the ground, and that is where cracks, damp and failed sealant begin.
A drone can film every face of the building and the terrace in a single visit, with no scaffolding. See high-rise building inspection by drone for what the footage covers. The fee for high-rise inspection is separate, generally Rs. 30,000 per block or building.
A standard mission covers one property. Tell us the extent, the number of buildings or blocks and what the footage is for, and we confirm the price before you order.
A handover record in Kelambakkam: price and delivery
Tall buildings take longer to film than a plot or a house, and they are priced separately. A handover record comes under our high-rise fee.
- From Rs. 6,000 for a quick video of up to 15 minutes.
- Generally Rs. 30,000 per block or building for the full inspection.
- Conveyance of Rs. 3,000.
- GST and other actuals additional.
Prices may vary with complexity, approval timelines and any additional services requested. T&C apply. Tell us how many blocks there are, how many floors, and where the building is. We confirm the amount before you commit.
You receive a video of about 15 minutes for each block or building. Where the building is large or its faces are complicated, the footage may run up to 45 minutes and is then delivered unedited.
If the weather stops a flight, we fly again for the same area, generally at no extra charge; in rare cases we charge the conveyance and transport for the repeat visit. Payment is taken on the Book a drone page.
Send us the location in Kelambakkam first. We tell you the conveyance and plan the mission once you order.
Kelambakkam is south of the city. Parts of this corridor fall under the controlled airspace of Chennai airport and the Tambaram air force station, so every address has to be checked. The airspace limit is read for each location.
We deliver within 7 working days, subject to Airspace Flying Approval. A location close to the airport or another protected site can take longer. With the order we need the first three pages of the land deed, the Google Maps location and your identity proof. T&C apply.
How to order
- Place your order. Send the Google Maps location, the first three pages of the land deed and your Aadhaar card or passport, and pay the mission fee.
- We plan the flight. We validate your documents and plan the flight. Subject to Airspace Flying Approval.
- We fly the mission. A pilot from our team or from one of our associates flies the property and its surroundings.
- You receive the output. 20 to 30 photographs and a video of about 5 minutes, within 7 working days, subject to Airspace Flying Approval.
What you send with the order
- The first three pages of the land deed for the property
- The Google Maps location of the property
- Your Aadhaar card or passport, front and back, with your address visible. If the address is not shown, add any other proof of address
- Payment of the mission fee
Questions
Who should order the handover record?
Either the association or the builder, or both jointly. The footage is delivered to whoever places the order.
Does the record prove a defect is the builder's responsibility?
It shows the condition on the date of the mission. Responsibility is decided under the agreement and the law, on your advocate's advice.
Can a drone fly in Kelambakkam?
It depends on the address. Parts of the corridor south of Chennai fall under controlled airspace, so the airspace zone matters here. Each mission is subject to Airspace Flying Approval.
How soon will I receive the footage for a property in Kelambakkam?
We deliver within 7 working days, subject to Airspace Flying Approval. A location close to the airport or another protected site can take longer.
What is a mission? What if the weather turns? See all common questions.