The day a builder in Medavakkam hands a project to its owners’ association, responsibility changes hands. A dated record of that day protects both sides. In Medavakkam the first question about any property is where the water goes.
The day a builder hands a project to its owners’ association is the day responsibility changes hands. After it, arguments begin: was that crack there at handover, was the terrace ever waterproofed properly, was the boundary wall complete? A dated video of the whole project settles such questions before they are asked.
Medavakkam is a fast-growing junction suburb between Velachery, Tambaram and the IT corridor, with apartment blocks, houses and several lakes.
What the record should include
A handover record is planned to be complete, not selective.
- All outer faces of every block, from ground to roof, including the faces that look on to neighbouring plots.
- Terraces: the surface, slopes, outlets, parapets, tanks, lift rooms and any solar or other equipment.
- External pipes, shafts and sunshades.
- The compound wall, gates and security cabin.
- Driveways, paving, open parking, landscaping and play areas.
- Sump, transformer yard, generator area and sewage treatment plant, as seen from above.
- The road and drains outside, and the state of neighbouring plots.
Amenities and areas indoors are not covered, because inspection missions are flown outdoors. Those should be recorded separately on the ground by the association and the builder together.
The property you find in Medavakkam
Medavakkam stands where the Velachery-Tambaram road meets the roads to Sholinganallur and Mambakkam. It has filled with apartment projects and residential layouts, bought largely by people who work on the IT corridor. Many flats are let or held as investments.
Most of the requests we expect from Medavakkam concern these kinds of property.
- Mid-rise apartment blocks. A handful of flats sharing one roof, one compound and the cost of every repair.
- High-rise flats. Many belong to people who live in another city or abroad, and are let or standing empty.
- Houses on individual plots. The roof, the wall and the open space around the house are all the owner’s concern.
For each of them the questions are the same. What condition is the building in from outside? What has been built next door since you last saw it? Is the boundary where it should be?
Timing the mission
The best moment is shortly before the formal handover, when the builder says the work is complete and before the association signs anything. That leaves time to raise what the footage shows.
We deliver within 7 working days, subject to Airspace Flying Approval. So the order should be placed ahead of the planned handover date.
Many associations repeat the exercise towards the end of the defect liability period. Comparing the two records shows what has deteriorated in the meantime and what should be raised with the builder before the period runs out. What the builder is obliged to repair is a legal question for the association’s advocate; the footage supplies the facts.
Finding your property in Medavakkam
A survey number tells the revenue office where land is. It does not tell a pilot. In Medavakkam, properties are found by what they are near: the Velachery-Tambaram road, the Pallikaranai marsh, Perumbakkam or the way to Sholinganallur.
So an order for Medavakkam should carry three things about location. First, a Google Maps pin dropped on the property. Second, the name of the layout, street or project, with the plot or door number. Third, the nearest well-known place and which side of it the property lies. With those, the mission can be planned without a phone call.
When the footage arrives, start with the wide shots. They show the property against the things you already know, such as the Velachery-Tambaram road, and make it easy to explain to a relative, an advocate or a buyer exactly where it is.
These names are mentioned only as reference points. Capture India is not connected with them.
What a handover record costs in Medavakkam
Tall buildings take longer to film than a plot or a house, and they are priced separately. A handover record comes under our high-rise fee.
- Rs. 12,000 for a quick video of up to 15 minutes.
- From Rs. 30,000 per block or building for the full inspection.
- Conveyance of Rs. 3,000.
- GST and other actuals additional.
Prices may vary with complexity, approval timelines and any additional services requested. T&C apply. Tell us how many blocks there are, how many floors, and where the building is. We confirm the amount before you commit.
You receive a video of about 15 minutes for each block or building. Where the building is large or its faces are complicated, the footage may run up to 45 minutes and is then delivered unedited.
If the weather stops a flight, we fly again for the same area, generally at no extra charge; in rare cases we charge the conveyance and transport for the repeat visit. Payment is taken on the Book a drone page.
For a property in Medavakkam, send the Google Maps location with your order. We confirm the conveyance for Medavakkam before you pay.
Medavakkam is south of the city. Parts of this corridor fall under the controlled airspace of Chennai airport and the Tambaram air force station, so every address has to be checked. The airspace limit is read for each location.
We deliver within 7 working days, subject to Airspace Flying Approval. A location close to the airport or another protected site can take longer. With the order we need the first three pages of the land deed, the Google Maps location and your identity proof. T&C apply.
How to order
- Book and pay. Fill in the Book a drone page with the location of the property and what you want filmed, and pay the amount it shows.
- Send your documents. We ask for the first three pages of the land deed and your passport, voter ID or driving licence. We validate them and plan the flight. Subject to Airspace Flying Approval.
- We fly the mission. A pilot from our team or from one of our associates flies the property and its surroundings.
- You receive the output. 20 to 30 photographs and a video of about 5 minutes, within 7 working days, subject to Airspace Flying Approval.
What you send after you book
- The first three pages of the land deed for the property
- The Google Maps location of the property
- Your passport, voter ID or driving licence, front and back, with your address visible. If the address is not shown, add any other proof of address
Questions
Who should order the handover record?
Either the association or the builder, or both jointly. The footage is delivered to whoever places the order.
Does the record prove a defect is the builder's responsibility?
It shows the condition on the date of the mission. Responsibility is decided under the agreement and the law, on your advocate's advice.
Can a drone fly in Medavakkam?
It depends on the address. Parts of the corridor south of Chennai fall under controlled airspace, so the airspace zone matters here. Each mission is subject to Airspace Flying Approval.
How soon will I receive the footage for a property in Medavakkam?
We deliver within 7 working days, subject to Airspace Flying Approval. A location close to the airport or another protected site can take longer.
What is a mission? What if the weather turns? See all common questions.