Serving Chennai, Kanchipuram, Chengalpattu and Tiruvallur+91 90030 05888info@captureindia.com
CaptureIndia.comA Drone Filming Company

Builder handover record in Alandur

Alandur is an old town at the foot of St. Thomas Mount, now a busy interchange of metro lines beside the Kathipara junction.

The day a builder in Alandur hands a project to its owners’ association, responsibility changes hands. A dated record of that day protects both sides. Streets in Alandur are closely built, and little can be judged from the gate.

Alandur is an old town at the foot of St. Thomas Mount, now a busy interchange of metro lines beside the Kathipara junction.

Why both sides should want one

For the association, the record shows the condition of everything it is taking over. Defects visible on that day can be listed and raised with the builder during the defect liability period. Without a record, the association is left with members’ recollections.

For the builder, the same record is protection. It shows that the buildings were handed over complete and in good order. Damage caused later, by residents’ alterations, by interior contractors or by poor maintenance, cannot fairly be laid at the builder’s door.

A record made by a third party with no interest in the outcome carries more weight than photographs taken by either side. That is the role Capture India plays: we film what is there and deliver it.

The property you find in Alandur

Alandur is one of the oldest settlements on the way out of the city, with narrow streets around its market and newer buildings along the main roads. The metro interchange and the Kathipara flyover have made it one of the best-connected places in Chennai, and old houses are steadily being replaced.

The property people ask us about in Alandur falls into a few kinds.

  • Older independent houses. Family homes built decades ago, now let, locked or shared between heirs.
  • Mid-rise apartment blocks. A handful of flats sharing one roof, one compound and the cost of every repair.
  • Commercial property. Let to businesses that add signs, sheds and floors as they need them.

For each of them the questions are the same. What condition is the building in from outside? What has been built next door since you last saw it? Is the boundary where it should be?

What the record should include

A handover record is planned to be complete, not selective.

  • All outer faces of every block, from ground to roof, including the faces that look on to neighbouring plots.
  • Terraces: the surface, slopes, outlets, parapets, tanks, lift rooms and any solar or other equipment.
  • External pipes, shafts and sunshades.
  • The compound wall, gates and security cabin.
  • Driveways, paving, open parking, landscaping and play areas.
  • Sump, transformer yard, generator area and sewage treatment plant, as seen from above.
  • The road and drains outside, and the state of neighbouring plots.

Amenities and areas indoors are not covered, because inspection missions are flown outdoors. Those should be recorded separately on the ground by the association and the builder together.

Finding your property in Alandur

People in Alandur give directions by landmarks, and so should an order. The best-known reference points here are St. Thomas Mount, the Kathipara junction and Alandur metro station. When you send us the location, drop a Google Maps pin on the property itself and add one line saying where it lies in relation to the nearest of these, for example which side of St. Thomas Mount it is on and roughly how far.

The same landmarks help you read the footage. The video takes in the property, the neighbourhood and the adjacent roads and pathways, subject to privacy and airspace limits, so you can see how the property sits in relation to the Kathipara junction and the way to Guindy. For an owner who has not been to Alandur for years, that wider view is often the surprise: the landmark is where it always was, and everything between it and the property has changed.

These names are used only to help place a property. Capture India has no association with them.

A handover record in Alandur: price and delivery

Tall buildings take longer to film than a plot or a house, and they are priced separately. A handover record comes under our high-rise fee.

  • From Rs. 6,000 for a quick video of up to 15 minutes.
  • Generally Rs. 30,000 per block or building for the full inspection.
  • Conveyance of Rs. 3,000.
  • GST and other actuals additional.

Prices may vary with complexity, approval timelines and any additional services requested. T&C apply. Tell us how many blocks there are, how many floors, and where the building is. We confirm the amount before you commit.

You receive a video of about 15 minutes for each block or building. Where the building is large or its faces are complicated, the footage may run up to 45 minutes and is then delivered unedited.

If the weather stops a flight, we fly again for the same area, generally at no extra charge; in rare cases we charge the conveyance and transport for the repeat visit. Payment is taken on the Book a drone page.

Send us the location in Alandur first. We tell you the conveyance and plan the mission once you order.

Alandur is close to Chennai airport at Meenambakkam, inside controlled airspace, so flights here are subject to Airspace Flying Approval.

We deliver within 7 working days, subject to Airspace Flying Approval. A location close to the airport or another protected site can take longer. With the order we need the first three pages of the land deed, the Google Maps location and your identity proof. T&C apply.

How to order

  1. Place your order. Send the Google Maps location, the first three pages of the land deed and your Aadhaar card or passport, and pay the mission fee.
  2. We plan the flight. We validate your documents and plan the flight. Subject to Airspace Flying Approval.
  3. We fly the mission. A pilot from our team or from one of our associates flies the property and its surroundings.
  4. You receive the output. 20 to 30 photographs and a video of about 5 minutes, within 7 working days, subject to Airspace Flying Approval.

What you send with the order

  • The first three pages of the land deed for the property
  • The Google Maps location of the property
  • Your Aadhaar card or passport, front and back, with your address visible. If the address is not shown, add any other proof of address
  • Payment of the mission fee

Questions

When should we order?

Ahead of the planned handover. We deliver within 7 working days, subject to Airspace Flying Approval.

Who should order the handover record?

Either the association or the builder, or both jointly. The footage is delivered to whoever places the order.

Can a drone fly in Alandur?

It depends on the address. Alandur is close to Chennai airport, inside controlled airspace. Each mission is subject to Airspace Flying Approval.

How soon will I receive the footage for a property in Alandur?

We deliver within 7 working days, subject to Airspace Flying Approval. A location close to the airport or another protected site can take longer.

What is a mission? What if the weather turns? See all common questions.

Tell us where in Alandur the property is.

Remote property monitoring: Rs. 6,000 + GST + a small conveyance fee for the movements. Send the location and we will confirm what your order needs.